For road & government contractors
Road Construction Material Supply for Contractors in Punjab
Subbase, aggregate base course, stone dust, asphalt aggregates and sand for NHA, C&W, LDA, PHA and housing-society works — graded to spec, weighed on kanta, and delivered by the truckload on your schedule. Rate contracts locked for 30–60 days.
What we supply
Every pavement layer from one supplier
Stone dust & asphalt aggregates
0–5 mm asphalt dust, 5–10, 10–20, 20–38 mm crush for hot-mix plants.
Asphalt materialsWBM, bedding & sand
Water bound macadam 40–63 mm, bajjar saaf bedding, Chenab/Ravi sand for concrete.
Road material hubHow we work with contractors
Built for site schedules, not shop counters
Locked rate contracts
Fix the per-CFT or per-ton rate for 30 or 60 days against a quantity commitment, so a diesel rise mid-project is our problem.
Trucks per day
Dumper and 22-wheeler fleet from Pull 111 and Taxila; 10–30 loads a day to one site with a dispatcher on WhatsApp.
Kanta slip and bilty
Every load weighed; gross, tare and net on the bilty; monthly statement with slip numbers for your RA bills.
Gradation and lab support
Sieve analysis per size; we coordinate UET / NHA-approved lab testing (gradation, LA abrasion, CBR) when the consultant asks.
Credit for registered firms
15–30 day credit for PEC-registered contractors after the first two paid loads.
Site-office contact
One dispatcher number for your site engineer; daily WhatsApp update of loads sent and slips.
Where we deliver
Projects across Punjab
- Lahore & Ring Road
- Kasur
- Sheikhupura
- Gujranwala
- Sialkot
- Faisalabad
- Sahiwal
- Okara
- Multan
- Sargodha
- Jhang
- Rawalpindi / Islamabad
Outside these, send the site pin — we quote material plus transport as one landed price.
FAQ
Contractor questions
Do you supply NHA / LDA specification material?
Yes. Subbase and base course are supplied to NHA General Specifications gradation and we provide sieve analysis per lot; third-party lab testing is arranged on request.
Can you give a rate contract for the whole project?
Yes — 30- or 60-day locked rates against a quantity commitment, with the delivery schedule agreed in writing.
Is material priced per ton or per CFT?
Either. Kanta weight (tons) is standard for road works; CFT measurement for societies and smaller sites.
Minimum order for projects?
One dumper (about 900 CFT / 20 tons) per delivery; most road jobs take 10–30 loads a day.
Send us the BOQ
Reply with a per-item quote within one working day.
